Project Name |
: |
Construction of Compound Natural Stone Factory |
| Employer |
: |
Peker Surface Designs A.Ş. |
|
|
|
| Location |
: |
MANİSA |
|
|
|
Peker Surface Designs was established at 2010 to manufacture and supply Quartz Enginnered Stone.
Quartz Engineered Stone is used at;Counters, Walls ,Floors.
Peker Surface Designs Production facility is under construction at Manisa/Turkey, The closed area is 14.000 m2 the construction will be finished at february 2011 and the facility will be under operation at the end of 2011
 |
Project Name |
: |
Kumköy Regulator and Right Coast Irrigation of Çarşamba Plain 1st. Part Construction |
| Employer |
: |
State Hydraulic Works |
|
|
|
| Location |
: |
SAMSUN |
|
|
|
The project comprises construction of Kumköy Regulator and Irrigation Network Facility for generation of 96.000.000 Kwh power and Irrigation of agricultural fields on a 20.000 Ha area.
The regulator building, 15 km main irrigation channel, 142 km auxiliary irrigation channel, 300 km tertiary irrigation channel, operation and maintenance roads and 2.900 works of art are included in this project.
134.000 m jet grouting drill, 43.000 m3 jet grouting injection of and 5.600 m bored pile construction, 83.000 m3 concrete job were performed in frame of Kumköy Regulator on Yeşilırmak River.
 |
Project Name |
: |
Oltu-Tuzlaköy-Serge-Çengelli-Kışla Hydro Electrical Power Plant |
| Employer |
: |
SİLEN Electricity Production Ltd. Co. |
|
|
|
| Location |
: |
ERZURUM |
|
|
|
Tuzlaköy-Serge Hydoelectric Plant which is lisenced by Tuyat Electricity Production Inc. is in Erzurum, Oltu. The station in Çoruh Basin, between Oltu and Penek rivers, is going to engineer with 2 turbines having 4MW power and 1 turbine having 1,58 MW power, sum of 9,58 MW. The Project expects to generate 39,06 GWh energy due to the river regime per year. Within the context of work, project and expropriation works are continuing.
 |
Project Name |
: |
Güllübağ Dam and Hydro Electrical Power Plant Project |
| Employer |
: |
Senerji Enerji Electricity Production Inc. |
|
|
|
| Location |
: |
ERZURUM |
|
|
|
This Project has located in Erzurum İspir discrete on Çoruh River which is owned by Senerji Energy Electricity Production Inc. The Güllübag HEPP Project is made up of a roller compacted concrete dam and a hydro electrical power plant.
In the period of 850 days 100.000 m3 RCC and 150.000 m3 reinforced concrete will be produced.
 |
Project Name |
: |
İbrala Dam Construction |
| Employer |
: |
State Hydraulic Works |
|
|
|
| Location |
: |
KONYA |
|
|
|
The dam built in scope of the Project shall supply 22.1 Hm3 fresh water per year for Karaman province and allow irrigation of agricultural fields on an area of 8700 Ha.
Technical Features of the Dam: Dam Volume: 8.080.000 m³, Lake Volume: 134 Hm³, Crest Length: 1107 m, Crest Elevation: 58 m, Spillway Type: Frontal, controlled, with three radial gates, Derivation Tunnel Type: at a length of 445 m and a diameter of 3 m
 |
Project Name |
: |
Kumköy Regulator and Right Coast Irrigation of Çarşamba Plain 1st. Part Construction |
| Employer |
: |
State Hydraulic Works |
|
|
|
| Location |
: |
SAMSUN |
|
|
|
This project comprises construction of Kumköy Regulator and Irrigation Network Facility for generation of 96.000.000 Kwh power and Irrigation of Agricultural Fields on a 20.000 Ha area.
The regulator building, 15 km Main Irrigation Channel, 142 km Auxiliary Irrigation Channel, 300 km Tertiary Irrigation Channel, Operation and Maintenance Roads and 2900 works of art are included in this project.
134.000 m jet grouting drill, 43.000 m3 jet grouting injection of and 5.600 m bored pile construction were performed in frame of the project on Yeşilırmak River.